Photos highlighting some of the issues that will be
addressed with the High School Repair Project

Floor in gymnasium had heaved and
required repair - wood was cut and removed and replaced
with cement. Floor is uneven in many areas.

Continual water damage on the floor
of the gymnasium

Outdated and broken scoreboard.

Several roof leaks in the gymnasium
ceiling.

Serious roof leak in weight room,
tarp was installed to catch the water and then is
directed to a hose which empties into a garbage can sump
pump system.

Serious floor heaves and water
damage in weight room.

Attempts have been made to repair
floor but the cement is now heaving.

Wiring is open in ceiling waiting
to be tied into the new wiring.
 
Roof leaks in Technology rooms over
expensive electronic equipment.
|