Photos highlighting some of the issues that will be addressed with the High School Repair Project

Floor in gymnasium had heaved and required repair - wood was cut and removed and replaced with cement. Floor is uneven in many areas.

Continual water damage on the floor of the gymnasium

Outdated and broken scoreboard.

Several roof leaks in the gymnasium ceiling.

Serious roof leak in weight room, tarp was installed to catch the water and then is directed to a hose which empties into a garbage can sump pump system.

Serious floor heaves and water damage in weight room.

Attempts have been made to repair floor but the cement is now heaving.

Wiring is open in ceiling waiting to be tied into the new wiring.

Roof leaks in Technology rooms over expensive electronic equipment.

 

               

<back

 

 
 
column spacer graphic column spacer graphic column spacer graphic
column spacer graphic    
bottom rule graphic column spacer graphic column rule graphic
column spacer graphic


column spacer graphic
dotted line graphic
column spacer graphic
column spacer graphic
column spacer graphic
 
column spacer graphic
column spacer graphic

column spacer graphic
     
This page is maintained according to Web publishing guidelines used by the Gloversville Enlarged School District. All rights reserved. This Web site was produced by the Capital Region BOCES Communications Service, Albany, NY © 2004.